검색어 "" 에 대한 총 22384 건의 검색결과를 찾았습니다.
Planning and Construction of a Modern Spinning Plant.
Critical aspects to consider in the planning and design of a new spinning plant with maximum production and optimal quality are examined. A discussion of the objectives, technology, organization and administration, and construction planning reveals a number of basic planning requirements, including planning for maximum technological flexi..
Changing Japanese Cotton Spinning Industry.
At the end of 1992, several major Japanese cotton yarn manufacturers announced their intentions to reduce the number of spindles on their machinery. Unitika announced a plan to reduce its spindles from 227,736 in March 1992 to 120,504 by March 1994. In april 1993, Kanebo announced the curtailment of the production capacity of its subsidia..
Computer Integrated Manufacturing (CIM) in Spinning -- Has the Future Arrived?
CIM is a comprehensive and fully integrated control system that enhances the competitiveness of spinning mills. The benefits of CIM include higher quality yarns, increased productivity, and decreased labor costs. Japanese yarn spinners are turning to CIM as a way to compete effectively with producers in countries with low computer network..
2008년 춘하절 신사용 내의 - 면의 장점과 새 분위기 살리려 신상품 제안
후지보 홀딩스 - 체제개선 상당성과 올려, 반전공세 개시
KB쓰즈키 - 재봉사사업 재구축하고 사업규모 확대
일본의 가이고(介護 : 수발) 비즈니스 - 새로운 수요로 떠오르고 있는 수발시장
외국계 투자기업을 위한 중국 신노동계약법에 알맞은 조치방안
일본 유력 소재메이커의 유니폼 사업전략 - 고코스트시대일수록 새로운 가치창조 중요
유럽의 텍스타일 전시회 - 일본기업들 앞다투어 출품