방적
economic-engineering assessment of a hypothetical tuft-to-yarn textile mill
- 출판일1999.03
- 저자
- 서지사항
- 등록일
2016.11.02
- 조회수
223
an economic-engineering simulation model has been developed for a hypothetical textile mill operating an integrated, continuous-flow, tuft-to-yarn (ty) system. the model was used to calculate costs of producing cotton denim yarns with two different ty configuration mills. these were compared with a similar model for a conventional open-end (oe) textile mill processing the same product at similar production rates. the models predict that the ty mills will reduce production costs by between 4. 11 and 6. 2 cents per pound of spun yarn which amounts to a reduction of between 18. 5 and 28 percent as compared with the conventional oe mill. considering the raw materials' cost as constant for all the models this processing cost reduction represents a total cost savings for the ty mills of between 4. 8 and 7. 3 percent of the total manufactured yarn costs. 10 refs