It has been shown that, if its outside walls are no longer than 40 m, a weaving mill can be constructed without supporting columns, thus improving spatial productivity. This article looks at the Hyperspan system of mill construction, developed by Elspan International Ltd., Hong Kong, which consists of an external framework combined with a system of internal cables.